Projects Gallery

To use the projects gallery, simply scroll down to a jobsite, and click a thumbnail to view the images at full size.

Provided the overlot grading, structural excavation, backfill and complete installation of a septic system.

View the embedded image gallery online at:
https://www.gerrardexcavating.com/projects#sigProId07f7581e92

Completed the demolition, earthwork and septic system installation for the Michaels Residence. Earthwork included the complete installation of a Redi-Block retaining wall.

View the embedded image gallery online at:
https://www.gerrardexcavating.com/projects#sigProId5d3151487b

Completed the infrastructure for this residential subdivision northeast of Fort Collins consisting of 50 estate lots.

View the embedded image gallery online at:
https://www.gerrardexcavating.com/projects#sigProIdc52818c327

As general contractor, completed the infrastructure and assisted the owner in delivering "ready to build" lots to clients.

View the embedded image gallery online at:
https://www.gerrardexcavating.com/projects#sigProId6d293ef71f

Fort Collins

Completed the earthwork and pipeline installation for the Home Depot in Fort Collins at the corner of Mulberry Street and Lemay Avenue.

View the embedded image gallery online at:
https://www.gerrardexcavating.com/projects#sigProIdb1cf5e6dfa

Severence Colorado

Provided the infrastructure for this large subdivision including the installation of 5829 LF of sanitary sewer main, 8666 LF of water main and 1517 LF of storm sewer. The detention ponds had their sides over excavated by 20,000 CY and were replaced with onsite clays creating a pond liner. Dewatering was required to achieve pond liner completion. Overlot excavations and embankments of almost 200,000 CY were also completed on this project.

View the embedded image gallery online at:
https://www.gerrardexcavating.com/projects#sigProId10b184a9ad

Completed the demolition, earthwork, structural excavation, backfill and pipeline installation required to construct the Low Point Wastewater Treatment Plant.

View the embedded image gallery online at:
https://www.gerrardexcavating.com/projects#sigProIdf52e67d123

Completed the installation of the pond at Highland Meadows Golf Course consisting of more than 300,000 CY of material.

View the embedded image gallery online at:
https://www.gerrardexcavating.com/projects#sigProId22fbc77e2e

Improved Kechter Road by removing and replacing existing paving, pipelines and structures. Also, increased the overall width of the road.

View the embedded image gallery online at:
https://www.gerrardexcavating.com/projects#sigProIda571f8274d

As general contractor, completed the demolition, earthwork, storm drainage and pipeline installation required to widen Lemay Avenue. This project was completed 43 days ahead of schedule!

View the embedded image gallery online at:
https://www.gerrardexcavating.com/projects#sigProId6d2541153f

FE Warren Air Force Base

A very large project that required precise coordination with the Federal Government during the massive excavation process. Utility pipelines and structure excavation was also included.

View the embedded image gallery online at:
https://www.gerrardexcavating.com/projects#sigProIde76469fd5d

Provided entire infrastructure for this massive development. Work was seperated into 5 bid packages and land uses range from Office, Flex/R&D, Light Industrial and Retail.

website

View the embedded image gallery online at:
https://www.gerrardexcavating.com/projects#sigProId73ab4fd4ef

The Nelson Dam was significantly damaged in the September flood.

Read more ...

Completed the demolition, earthwork and pipeline installation for the T-Bone Ranch Apartments including the complete installation of a 1,300 CY sediment trap.

Completed the installation of approximately 7,400 LF of water pipeline and 4,300 LF of sewer pipeline that services 117 lots.

Completed the installation of more than 14,300 LF of pipeline that was required to service the 132 residential lots.

Completed the demolition, earthwork and pipeline installation for The Lodge. Earthwork included the import of more than 18,000 CY of material needed to establish proper drainage patterns.

Completed the demolition, earthwork and pipeline installation for Cottonwood Ridge. Earthwork included the import of more than 25,000 CY of material, the subgrade preparation for nearly 60,000 SF of asphalt and approximately 5,000 LF of sidewalk.

Completed the demolition, earthwork and pipeline installation for Matthews Farm including a 12,000 CY pond excavation with a 65,000 SF PVC pond liner.

Completed the earthwork and pipeline installation for Summer Park. Gerrard provided 15 water services for this project.